RESULT
While processing oil contaminated soils in UOG-15 plant, during the first cycle of treatment a residual oil content achieved in the range from 1 000 to 10 000 mg / kg (ppm), and in subsequent cycles able to reach result of 300 ppm.
At the end of the work maintenance carried on plant, tanks and reservoirs cleaned, plant loaded and can be transported to another location for further work.